Brazil
Clique aqui para acessar o site em Português
Brazil
English
Please Click here to View the Site in English
English
Spanish
Haga clic aquí para ver el sitio en Español
Spanish
French
SVP cliquez ici pour consulter le site en français
French
Chinese
请点击这里查看IMP中文网站
Chinese /
Products

Think "Different"!
Challenge conventional sample processing.

IMP

Menu

Enquiry

Mining » Iron ore mining » Iron Ore Automation Projects » BHP Billiton Iron Ore Newman Australia

BHP Billiton Iron Ore Newman Australia


 

Scope of supply: The Newman automated laboratory is the largest fully automated robotic iron ore laboratory in the world.

 

The end to end automated facility receives up to 15kg samples from the plant. These samples are registered and manually entered into one of two automated sample prep lines. The samples are automatically dried and, where required weighed, to determine the moisture content.

 

The samples are subsequently crushed, split, pulverised and dosed into barcoded vials. The vials are then automatically transported to one of four automated robotic fusion and TGA machines. These machines weigh samples for TGA and fusion for subsequent XRF analysis.

 

The entire process from the 15kg wet sample to XRF and TGA analysis is fully automated. The facility also accepts sample trays from satellite laboratories that are automatically processed. 

Enquiry

Fields Marked with a * are required
*First Name
Last Name
Product
*Email
Phone Number
Comments enquiry
Country
Company